Power generation companies' (Genco) bidding strategy should consider the optimality in an entire period of time due to the unit operating constraints coupling over times. This paper presents a model for obtaining a Genco's optimal bidding strategy in the hour-ahead power market through Q-learning with unit operating constraints and start-up cost incorporated. The optimal bidding strategy in terms of cumulative total returns is gained through the iterative learning process. Numerical testing results show that this method is effective.