跳到主要导航 跳到搜索 跳到主要内容

The software rejuvenation model with pre-start technology

  • Xi'an Jiaotong University

科研成果: 书/报告/会议事项章节会议稿件同行评审

4 引用 (Scopus)

摘要

Software aging related failures can be prevented by applying software rejuvenation technology. But the restart operation in the software rejuvenation phase makes the system unable to provide services, which leads to system unavailability. The software rejuvenation model with pre-start technology is therefore proposed to reduce downtime and improve availability by switching between active copy and backup copy, which can substitute for restart operation and resolve unavailability problem. First of all, the rejuvenation operation of model with prestart technology is described and improvements on the conventional model are presented. Second, the model availability is calculated by Markov Regenerative process. And finally, according to the experimental results, current model proves to be more available than the conventional one.

源语言英语
主期刊名Proceedings - International Symposium on Information Processing, ISIP 2008 and International Pacific Workshop on Web Mining and Web-Based Application, WMWA 2008
723-727
页数5
DOI
出版状态已出版 - 2008
活动International Symposium on Information Processing, ISIP 2008 and International Pacific Workshop on Web Mining and Web-Based Application, WMWA 2008 - Moscow, 俄罗斯联邦
期限: 23 5月 200825 5月 2008

出版系列

姓名Proceedings - International Symposium on Information Processing, ISIP 2008 and International Pacific Workshop on Web Mining and Web-Based Application, WMWA 2008

会议

会议International Symposium on Information Processing, ISIP 2008 and International Pacific Workshop on Web Mining and Web-Based Application, WMWA 2008
国家/地区俄罗斯联邦
Moscow
时期23/05/0825/05/08

学术指纹

探究 'The software rejuvenation model with pre-start technology' 的科研主题。它们共同构成独一无二的指纹。

引用此