In this paper, we investigate the resource-constrained project scheduling problem with resource transfer times under uncertain environment, aiming to generate robust baseline schedules that will be as stable as possible during project execution. In this problem, resource transfer times are taken into account, and the objective function is solution robustness maximization. As the problem is proved to be NP-hard in the strong sense, we develop a tabu search algorithm to solve the problem. After linearizing the proposed model, we use a commercial mathematical programming solver as a benchmark to solve the problem. From the computational results, we find that the developed tabu search algorithm is effective and efficient in solving the defined problem, which offers a way to deal with the proactive scheduling problem with resource transfer times. Through a sensitivity analysis, we find that robustness increases with the extension of the project due date and the decrease of resource transfer times.

源语言英语
主期刊名Proceedings of the 2019 International Conference on Industrial Engineering and Systems Management, IESM 2019
编辑Feifeng Zheng, Feng Chu, Ming Liu
出版商Institute of Electrical and Electronics Engineers Inc.
ISBN(电子版)9781728115665
DOI
出版状态已出版 - 9月 2019
活动2019 International Conference on Industrial Engineering and Systems Management, IESM 2019 - Shanghai, 中国
期限: 25 9月 2019 → 27 9月 2019

丛书

姓名Proceedings of the 2019 International Conference on Industrial Engineering and Systems Management, IESM 2019

会议

会议2019 International Conference on Industrial Engineering and Systems Management, IESM 2019
国家/地区中国
市Shanghai
时期25/09/19 → 27/09/19

学术指纹

探究 'The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times' 的科研主题。它们共同构成独一无二的学术指纹。

引用此