In reality, a contractor may implement multiple pro jects simultaneously and in such an environment, how to achieve a positive balance between cash outflow and inflow by scheduling is an important problem for the contractor has to tackle. For this fact, this paper investigates a resource-constrained multi-pro ject scheduling problem with the ob jective of minimizing the contractor's maximal cash flow gap under the constraint of a project deadline and renewable resource. In the paper, we construct a non-linear integer programming optimization model for the studied problem at first. Then, for the NP-hardness of the problem, we design three metaheuristic algorithms to solve the model: tabu search (TS), simulated annealing (SA), and an algorithm comprising both TS and SA (SA-TS). Finally, we conduct a computational experiment on a data set coming from existing literature to evaluate the performance of the developed algorithms and analyze the effects of key parameters on the ob jective function. Based on the computational results, the following conclusions are drawn: Among the designed algorithms, the SA-TS with an improvement measure is the most promising for solving the problem under study. Some parameters may exert an important effect on the contractor's maximal cash flow gap.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 2451-2474 |
| 页数 | 24 |
| 期刊 | Journal of Industrial and Management Optimization |
| 卷 | 17 |
| 期 | 5 |
| DOI | |
| 出版状态 | 已出版 - 2021 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'TABU SEARCH AND SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED MULTI-PROJECT SCHEDULING TO MINIMIZE MAXIMAL CASH FLOW GAP' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver