Sizing of Battery Energy Storage for Wind Integration: Considering Frequency Regulation and Peak Load Shaving

  • Yan Cheng
  • , Peng Yu
  • , Shumin Sun
  • , Nan Wang
  • , Yuanhang Zhang
  • , Peng Kou
  • Shandong Electric Power Research Institute
  • Xi'an Jiaotong University

科研成果: 书/报告/会议事项章节会议稿件同行评审

3 引用 (Scopus)

摘要

The development of modern power system is accompanied by many problems. The growing proportion of wind generation in power grid gives rise to frequency instability problem. The increasing load demand in power grid worsens the load peak-to-valley difference problem. Battery Energy Storage System (BESS) has the capability of frequency regulation and peak load shaving, but its high economic costs need to be taken into consideration. To address this issue, this paper proposes a sizing strategy for BESS with wind integration under the condition of frequency regulation and peak load shaving. In the case of eliminating frequency deviations, the sizing of BESS is decided by the approximated Laplace distribution based on wind power prediction errors. As for peak load shaving, the load interval control method is used for the sizing of BESS. Simulation results demonstrate the effectiveness of the proposed scheme.

源语言英语
主期刊名2022 5th International Conference on Energy, Electrical and Power Engineering, CEEPE 2022
出版商Institute of Electrical and Electronics Engineers Inc.
205-209
页数5
ISBN(电子版)9781665479059
DOI
出版状态已出版 - 2022
活动5th International Conference on Energy, Electrical and Power Engineering, CEEPE 2022 - Chongqing, 中国
期限: 22 4月 202224 4月 2022

出版系列

姓名2022 5th International Conference on Energy, Electrical and Power Engineering, CEEPE 2022

会议

会议5th International Conference on Energy, Electrical and Power Engineering, CEEPE 2022
国家/地区中国
Chongqing
时期22/04/2224/04/22

学术指纹

探究 'Sizing of Battery Energy Storage for Wind Integration: Considering Frequency Regulation and Peak Load Shaving' 的科研主题。它们共同构成独一无二的指纹。

引用此