跳到主要导航 跳到搜索 跳到主要内容

Severe accident analysis for a typical PWR using the MELCOR code

  • Xi'an Jiaotong University

科研成果: 期刊稿件文章同行评审

57 引用 (Scopus)

摘要

Using the MELCOR code, we simulated and analyzed a severe accident at a Chinese pressurized reactor 1000-MW (CPR1000) power plant caused by station blackout (SBO) with failure of the steam generator (SG) safety relief valve (SRV). The CPR1000 response and results for three different scenarios were analyzed: (i) seal leakage and an auxiliary feed water (AFW) supply; (ii) no seal leakage or AFW supply; and (iii) seal leakage but no AFW supply. The results for the three scenarios are compared with those for a simple SBO accident. According to our calculations, the SG SRV stuck in the open position would greatly accelerate the sequence for a severe accident. For an SBO accident with the SRV stuck open without seal leakage or an AFW supply, the pressure vessel would fail at 9576 s and the containment system would fail at 124,000 s. If AFW is supplied, pressure vessel failure would be delayed nearly 30000 s and containment failure would delay at least 50000 s. When seal leakage exists, pressure vessel failure is delayed about 50 s and containment failure time would delay about 30000 s. The results will be useful in gaining an insight into the detailed processes involved and establishing management guidelines for a CPR1000 severe accident.

源语言英语
页(从-至)30-38
页数9
期刊Progress in Nuclear Energy
71
DOI
出版状态已出版 - 2014

学术指纹

探究 'Severe accident analysis for a typical PWR using the MELCOR code' 的科研主题。它们共同构成独一无二的学术指纹。

引用此