摘要
Using the MELCOR code, we simulated and analyzed a severe accident at a Chinese pressurized reactor 1000-MW (CPR1000) power plant caused by station blackout (SBO) with failure of the steam generator (SG) safety relief valve (SRV). The CPR1000 response and results for three different scenarios were analyzed: (i) seal leakage and an auxiliary feed water (AFW) supply; (ii) no seal leakage or AFW supply; and (iii) seal leakage but no AFW supply. The results for the three scenarios are compared with those for a simple SBO accident. According to our calculations, the SG SRV stuck in the open position would greatly accelerate the sequence for a severe accident. For an SBO accident with the SRV stuck open without seal leakage or an AFW supply, the pressure vessel would fail at 9576 s and the containment system would fail at 124,000 s. If AFW is supplied, pressure vessel failure would be delayed nearly 30000 s and containment failure would delay at least 50000 s. When seal leakage exists, pressure vessel failure is delayed about 50 s and containment failure time would delay about 30000 s. The results will be useful in gaining an insight into the detailed processes involved and establishing management guidelines for a CPR1000 severe accident.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 30-38 |
| 页数 | 9 |
| 期刊 | Progress in Nuclear Energy |
| 卷 | 71 |
| DOI | |
| 出版状态 | 已出版 - 2014 |
学术指纹
探究 'Severe accident analysis for a typical PWR using the MELCOR code' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver