跳到主要导航 跳到搜索 跳到主要内容

Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan

  • Jun Pei
  • , Panos M. Pardalos
  • , Xinbao Liu
  • , Wenjuan Fan
  • , Shanlin Yang
  • Hefei University of Technology
  • University of Florida
  • Key Lab of the Ministry of Education for Process Control and Efficiency Egineering
  • North Carolina State University

科研成果: 期刊稿件 › 文章 › 同行评审

94 引用 (Scopus)

摘要

This paper investigates the coordinated scheduling problem of production and transportation in a two-stage supply chain, where the actual job processing time is a linear function of its starting time. During the production stage the jobs are first processed in serial batches on a bounded serial batching machine at the manufacturer's site. Then, the batches are delivered to a customer by a single vehicle with limited capacity during the transportation stage, and the vehicle can only deliver one batch at one time. The objective of this proposed scheduling problem is to make decisions on job batching and batch sequencing so as to minimize the makespan. Moreover, we consider two different models. With regards to the scheduling model with a buffer for storing the processed batches before transportation, we develop an optimal algorithm to solve it. For the scheduling model without buffer, we present some useful properties and develop a heuristic H for solving it. Then a novel lower bound is derived and two optimal algorithms are designed for solving two special cases. Furthermore, computational experiments with random instances of different sizes are conducted to evaluate the proposed heuristic H, and the results show that our proposed algorithm is superior to other four approaches in the literature. Besides, heuristic H in our experiments can effectively and efficiently solve both small-size and large-size problems in a reasonable time.

源语言英语
页(从-至)13-25
页数13
期刊European Journal of Operational Research
卷244
期1
DOI
出版状态已出版 - 1 7月 2015
已对外发布是

学术指纹

探究 'Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan' 的科研主题。它们共同构成独一无二的学术指纹。

引用此