Scheduling Interrelated Activities Using Insertion-Based Heuristics

  • Xi'an Jiaotong University
  • Northwestern Polytechnical University Xian

科研成果: 期刊稿件文章同行评审

16 引用 (Scopus)

摘要

The issue of scheduling interrelated activities is important and of particular concern to design managers. One tool that helps us to solve this issue is the design structure matrix (DSM) which can explicitly represent the information dependencies among interrelated activities. Based on the DSM method, this study presents effective approaches for sequencing interrelated activities with the goal of minimizing total feedback length, which is a good approximation for reducing project completion time. First, we prove two new properties of the problem, and develop an insertion-based heuristic. Second, the proposed heuristic is further improved by combing it with simulated annealing and genetic algorithm. Computer experiments show that our approaches outperform existing heuristics, in that with similar settings, our approaches often produces better solutions.

源语言英语
文章编号8068940
页(从-至)113-127
页数15
期刊IEEE Transactions on Engineering Management
65
1
DOI
出版状态已出版 - 2月 2018

学术指纹

探究 'Scheduling Interrelated Activities Using Insertion-Based Heuristics' 的科研主题。它们共同构成独一无二的指纹。

引用此