跳到主要导航 跳到搜索 跳到主要内容

Robust dispatch for Integrated Electricity and Natural Gas System Considering Wind Power Uncertainty

  • State Key Laboratory of Electrical Insulation and Power Equipment
  • Smart Gird Key Laboratory of Shaanxi Povince
  • Xi'an Jiaotong University

科研成果: 期刊稿件会议文章同行评审

10 引用 (Scopus)

摘要

With the support of flexible gas-fired generations and power-to-gas technologies, the integrated electricity and natural gas system (IEGS) is able to achieve a deep penetration of renewable energy. This paper proposes a two-stage robust day-ahead dispatch model for IEGS against the uncertainty of wind power, electricity load and gas load. Nonlinear and nonconvex natural gas flow constraints are relaxed into the second-order cone constraints considering the gas flow directions. Then the Column &Constraint Generation method is adopted to solve the proposed two-stage robust optimization problem. An IEEE 39-bus-20-gas- node test IEGS is used to test the effectiveness of proposed model.

源语言英语
页(从-至)130-135
页数6
期刊Energy Procedia
159
DOI
出版状态已出版 - 2019
活动2018 Renewable Energy Integration with Mini/Microgrid, REM 2018 - Rhodes, 希腊
期限: 28 9月 201830 9月 2018

联合国可持续发展目标

此成果有助于实现下列可持续发展目标:

  1. 可持续发展目标 7 - 经济适用的清洁能源
    可持续发展目标 7 经济适用的清洁能源

学术指纹

探究 'Robust dispatch for Integrated Electricity and Natural Gas System Considering Wind Power Uncertainty' 的科研主题。它们共同构成独一无二的指纹。

引用此