摘要
Based on the quantitative analysis method of thermal economy for the secondary circuit of M310 PWR nuclear power plant, a reactor safety analysis method is proposed. With this method, the accident of two high-pressure reheater trains out of service is analyzed and calculated. This accident is also assessed on the full-scope simulator. The results by the method carried out in the paper agree well with those of the simulation, which indicates that the reactor safety analysis method is correct and valid.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 46-50 |
| 页数 | 5 |
| 期刊 | Hedongli Gongcheng/Nuclear Power Engineering |
| 卷 | 38 |
| 期 | 1 |
| DOI | |
| 出版状态 | 已出版 - 15 2月 2017 |
学术指纹
探究 'Research on reactor safety analysis method due to thermal system change of secondary circuit' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver