@inproceedings{3ea98f561938444e863cffc0bf4b0a65,
title = "Reliability Assessment of Wind, Solar and Hydropower Combined System",
abstract = "The power industry located in southwestern China is constructing a wind, solar and hydropower combined system. To this end, reliability assessment on this practical power system is needed. Based on a unique algorithm for quickly solving the loss of the load probability (LOLP) curve, this paper considers timing correlation of different types of energy sources and develops a reliability analysis procedure for multi-energy combined systems. The results show that the reliability indices obtained by ignoring the timing correlation is higher than that considering the timing correlation, which means the reliability of the system will be overestimated, and this may lead to operational safety risks.",
keywords = "Credibility capacity, fast algorithm, loss of load probability, wind power",
author = "Xiaojun Xie and Qiong Wu and Ruigang Zhang and Zhentong Shao and Qiaozhu Zhai",
note = "Publisher Copyright: {\textcopyright} 2020 Technical Committee on Control Theory, Chinese Association of Automation.; 39th Chinese Control Conference, CCC 2020 ; Conference date: 27-07-2020 Through 29-07-2020",
year = "2020",
month = jul,
doi = "10.23919/CCC50068.2020.9189189",
language = "英语",
series = "Chinese Control Conference, CCC",
publisher = "IEEE Computer Society",
pages = "5349--5354",
editor = "Jun Fu and Jian Sun",
booktitle = "Proceedings of the 39th Chinese Control Conference, CCC 2020",
}