TY - GEN
T1 - PTRs as Green Power Compliance Certificates
T2 - 3rd IEEE International Conference on Electrical Power Systems and Intelligent Control, EPSIC 2026
AU - Wang, Weizhi
AU - Sun, Rongfu
AU - Shi, Zhenjiang
AU - Zhu, Tianbo
AU - Liu, Qinzhe
AU - Yue, Hao
AU - Xiao, Yunpeng
N1 - Publisher Copyright:
© 2026 IEEE.
PY - 2026
Y1 - 2026
N2 - Under the East Data, West Computing (EDWC) Project, cross-province computing power transfer is a key path to absorb green power in western China and achieve carbon neutrality for data centers. However, the current cross-province green power trading faces the pain point of "separation of certificate and power": green power can be physically transmitted across provinces, but its green attributes cannot be certified for compliance at the receiving end. This causes data centers to face high penalty costs for failing to meet green power compliance requirements, which severely restricts the economic feasibility of cross-province computing-electricity coordination. To solve this problem, this paper proposes to use physical transmission rights (PTRs) as the compliance certificate for the cross-province transfer of green power attributes, and constructs an intra-day coordinated optimization model for dual data centers integrating computing power dispatch, transmission right trading and green power compliance accounting. Against the background of the green power pattern of "Southwest hydropower + Northwest wind and solar power", the model sets up two comparison scenarios of "absence of transmission rights"and "binding of transmission rights"to quantitatively evaluate the cost optimization effect of the transmission right mechanism. The research shows that PTRs can resolve the high institutional penalty risk with extremely low transaction costs, and are a necessary institutional tool to realize full-chain traceability, certification and compliance of cross-province green power.
AB - Under the East Data, West Computing (EDWC) Project, cross-province computing power transfer is a key path to absorb green power in western China and achieve carbon neutrality for data centers. However, the current cross-province green power trading faces the pain point of "separation of certificate and power": green power can be physically transmitted across provinces, but its green attributes cannot be certified for compliance at the receiving end. This causes data centers to face high penalty costs for failing to meet green power compliance requirements, which severely restricts the economic feasibility of cross-province computing-electricity coordination. To solve this problem, this paper proposes to use physical transmission rights (PTRs) as the compliance certificate for the cross-province transfer of green power attributes, and constructs an intra-day coordinated optimization model for dual data centers integrating computing power dispatch, transmission right trading and green power compliance accounting. Against the background of the green power pattern of "Southwest hydropower + Northwest wind and solar power", the model sets up two comparison scenarios of "absence of transmission rights"and "binding of transmission rights"to quantitatively evaluate the cost optimization effect of the transmission right mechanism. The research shows that PTRs can resolve the high institutional penalty risk with extremely low transaction costs, and are a necessary institutional tool to realize full-chain traceability, certification and compliance of cross-province green power.
KW - computing power dispatch
KW - data center
KW - green power traceability
KW - physical transmission right
UR - https://www.scopus.com/pages/publications/105045476030
U2 - 10.1109/EPSIC70071.2026.11590209
DO - 10.1109/EPSIC70071.2026.11590209
M3 - 会议稿件
AN - SCOPUS:105045476030
T3 - 2026 IEEE 3rd International Conference on Electrical Power Systems and Intelligent Control, EPSIC 2026
BT - 2026 IEEE 3rd International Conference on Electrical Power Systems and Intelligent Control, EPSIC 2026
PB - Institute of Electrical and Electronics Engineers Inc.
Y2 - 22 May 2026 through 24 May 2026
ER -