Self-scheduling of autonomous power plant in energy intensive enterprise is of great importance in reducing both the cost of electricity consumption and the effects on the regional grid caused by serious fluctuation of load demand. Main deficiencies of the generally adopted discrete time based formulation framework in literature include the followings. The integral relationship between electrical energy and power output of generators is not exactly modeled. Uncertainty of load demand is also not fully addressed. Therefore, the scheduling results obtained by using the formulation may deviate from the optimal one under time-of-use price. A continuous time based scheduling formulation was established with consideration of both the above mentioned integral relationship and load demand uncertainty. By solving the final convex program formulation, an optimal scheduling solution in the sense of expectation can be obtained and no complete information of load demand distribution is required. Numerical testing was performed and the effectiveness of the method was verified.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 2648-2655 |
| 页数 | 8 |
| 期刊 | Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering |
| 卷 | 36 |
| 期 | 10 |
| DOI | |
| 出版状态 | 已出版 - 20 5月 2016 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'Power generation scheduling of autonomous power plant in energy intensive enterprise based on exact electricity balance constraints' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver