跳到主要导航 跳到搜索 跳到主要内容

Overview of the present progress and activities on the CFETR

  • Yuanxi Wan
  • , Jiangang Li
  • , Yong Liu
  • , Xiaolin Wang
  • , Vincent Chan
  • , Changan Chen
  • , Xuru Duan
  • , Peng Fu
  • , Xiang Gao
  • , Kaiming Feng
  • , Songlin Liu
  • , Yuntao Song
  • , Peide Weng
  • , Baonian Wan
  • , Farong Wan
  • , Heyi Wang
  • , Songtao Wu
  • , Minyou Ye
  • , Qingwei Yang
  • , Guoyao Zheng
  • Ge Zhuang, Qiang Li
  • CAS - Institute of Plasma Physics
  • University of Science and Technology of China
  • Southwestern Institute of Physics
  • China Academy of Engineering Physics
  • University of Science and Technology Beijing
  • Huazhong University of Science and Technology

科研成果: 期刊稿件文献综述同行评审

702 引用 (Scopus)

摘要

The China Fusion Engineering Test Reactor (CFETR) is the next device in the roadmap for the realization of fusion energy in China, which aims to bridge the gaps between the fusion experimental reactor ITER and the demonstration reactor (DEMO). CFETR will be operated in two phases. Steady-state operation and self-sufficiency will be the two key issues for Phase I with a modest fusion power of up to 200 MW. Phase II aims for DEMO validation with a fusion power over 1 GW. Advanced H-mode physics, high magnetic fields up to 7 T, high frequency electron cyclotron resonance heating and lower hybrid current drive together with off-axis negative-ion neutral beam injection will be developed for achieving steady-state advanced operation. The recent detailed design, research and development (R&D) activities including integrated modeling of operation scenarios, high field magnet, material, tritium plant, remote handling and future plans are introduced in this paper.

源语言英语
文章编号102009
期刊Nuclear Fusion
57
10
DOI
出版状态已出版 - 23 6月 2017

学术指纹

探究 'Overview of the present progress and activities on the CFETR' 的科研主题。它们共同构成独一无二的指纹。

引用此