跳到主要导航 跳到搜索 跳到主要内容

Online strategy for scheduling a hydroelectric station

  • Xi'an Jiaotong University

科研成果: 书/报告/会议事项章节 › 会议稿件 › 同行评审

3 引用 (Scopus)

摘要

The scheduling problem of reservoir hydroelectric station during the flood season caused major concern in academia and industry many years. Due to the uncertainty of flood, the schedule strategy should guarantee the enough flood prevention capacity of hydroelectric, meanwhile, a certain water head should also be kept in order to guarantee the power generation efficiency. Therefore, it's a challenging to design the strategy of optimal scheduling for hydroelectric in flood season. This paper in response to this objective, online algorithm will be applied here to analysis optimal strategy, which manages the reservoir scheduling in terms of online strategy and competitive analysis. Then the evidence from Ankang reservoir are collected to test the competitive ratio of online strategy. The result and model of the study in this paper have guiding significance and reference value to decision makers facing the similar situation.

源语言英语
主期刊名WCICA 2012 - Proceedings of the 10th World Congress on Intelligent Control and Automation
页2479-2484
页数6
DOI
出版状态已出版 - 2012
活动10th World Congress on Intelligent Control and Automation, WCICA 2012 - Beijing, 中国
期限: 6 7月 2012 → 8 7月 2012

丛书

姓名Proceedings of the World Congress on Intelligent Control and Automation (WCICA)

会议

会议10th World Congress on Intelligent Control and Automation, WCICA 2012
国家/地区中国
市Beijing
时期6/07/12 → 8/07/12

学术指纹

探究 'Online strategy for scheduling a hydroelectric station' 的科研主题。它们共同构成独一无二的学术指纹。

引用此