TY - JOUR
T1 - Nuclear-data uncertainty propagation in transient simulation for the C5G7-TD benchmark problem
AU - Wan, Chenghui
AU - Sui, Zhuojie
AU - Wang, Bo
AU - Cao, Liangzhi
AU - Liu, Zhouyu
AU - Hou, Jason
N1 - Publisher Copyright:
© 2019 Elsevier Ltd
PY - 2020/6/1
Y1 - 2020/6/1
N2 - In this study, uncertainty analysis has been performed to the time-dependent transient simulation of the C5G7-TD benchmark problem, propagating the nuclear-data uncertainties to the key parameters of interest. The detailed material compositions and geometries of C5G7-TD have been applied for the time-dependent transient simulation. For uncertainty analysis of the transient simulation, multigroup cross-section covariance library has been generated based on ENDF/B-VII.1 using the NJOY code. Our home-developed uncertainty-analysis code named UNICORN has been utilized for the uncertainty analysis, using the statistical sampling method. For the steady-state and transient simulations, our home-developed high-fidelity neutronics code NECP-X has been utilized. The relative uncertainties of the fuel-assembly normalized power and pin-wise power have been quantified as function of time. The numerical results show that the maximum relative uncertainties for the assembly normalized power can up to be about 2.14% and the value for the pin-wise power distributions can be about 3.54%.
AB - In this study, uncertainty analysis has been performed to the time-dependent transient simulation of the C5G7-TD benchmark problem, propagating the nuclear-data uncertainties to the key parameters of interest. The detailed material compositions and geometries of C5G7-TD have been applied for the time-dependent transient simulation. For uncertainty analysis of the transient simulation, multigroup cross-section covariance library has been generated based on ENDF/B-VII.1 using the NJOY code. Our home-developed uncertainty-analysis code named UNICORN has been utilized for the uncertainty analysis, using the statistical sampling method. For the steady-state and transient simulations, our home-developed high-fidelity neutronics code NECP-X has been utilized. The relative uncertainties of the fuel-assembly normalized power and pin-wise power have been quantified as function of time. The numerical results show that the maximum relative uncertainties for the assembly normalized power can up to be about 2.14% and the value for the pin-wise power distributions can be about 3.54%.
KW - C5G7 benchmark problem
KW - Nuclear-data uncertainties
KW - Transient simulation
KW - Uncertainty analysis
UR - https://www.scopus.com/pages/publications/85074503025
U2 - 10.1016/j.anucene.2019.107122
DO - 10.1016/j.anucene.2019.107122
M3 - 文章
AN - SCOPUS:85074503025
SN - 0306-4549
VL - 140
JO - Annals of Nuclear Energy
JF - Annals of Nuclear Energy
M1 - 107122
ER -