跳到主要导航 跳到搜索 跳到主要内容

New results on single-machine scheduling with past-sequence-dependent delivery times

  • Tongji University
  • Xi'an Jiaotong University
  • Ecole Centrale Paris

科研成果: 期刊稿件文章同行评审

19 引用 (Scopus)

摘要

Scheduling with past-sequence-dependent (psd) delivery times is motivated by questions that arise in the electronic manufacturing industry: an electronic component may be exposed to certain a electromagnetic field while waiting for processing and is required to neutralize the effect of electromagnetism. The time spent on the neutralization process has been modeled as psd delivery time in the literature. In this paper, we consider single-machine scheduling problems with psd delivery times. We respectively derive polynomial algorithms for the following objective functions: the minimization of the total weighted completion time, the total weighted discounted completion time, the total absolute differences in completion times and the sum of earliness, tardiness and common due date penalty. At last, for the criteria of minimization the total weighted tardiness, we propose a polynomial algorithm to optimally solve the problem under a certain condition.

源语言英语
页(从-至)55-61
页数7
期刊Theoretical Computer Science
438
DOI
出版状态已出版 - 22 6月 2012

学术指纹

探究 'New results on single-machine scheduling with past-sequence-dependent delivery times' 的科研主题。它们共同构成独一无二的学术指纹。

引用此