摘要
Energy storage devices can effectively balance the uncertain load and significantly reduce electricity costs in the community microgrids (C-MGs) integrated with renewable energy sources. Scheduling of energy storage is a multi-stage decision problem in which the decisions must be guaranteed to be nonanticipative and multi-stage robust (all-scenario-feasible). To satisfy these two requirements, this paper proposes a method based on a necessary and sufficient feasibility condition of scheduling decisions under the polyhedral uncertainty set. Unlike the most popular affine decision rule (ADR) based multi-stage robust optimization (MSRO) method, the method proposed in this paper does not require the affine decision assumption, and the feasible regions (the set of all feasible solutions) are not reduced, nor is the solution quality affected. A simple illustrative example and real-scale scheduling cases demonstrate that the proposed method can find feasible solutions when the ADR-based MSRO fails, and that it finds better solutions when both methods succeed. Comprehensive case studies for a real system are performed and the results validate the effectiveness and efficiency of the proposed method.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 1923-1934 |
| 页数 | 12 |
| 期刊 | Journal of Modern Power Systems and Clean Energy |
| 卷 | 11 |
| 期 | 6 |
| DOI | |
| 出版状态 | 已出版 - 1 11月 2023 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'Multi-Stage Robust Scheduling for Community Microgrid with Energy Storage' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver