跳到主要导航 跳到搜索 跳到主要内容

Modeling and analysis of thrust force for EPB shield tunneling machine

  • Lintao Wang
  • , Guofang Gong
  • , Hu Shi
  • , Huayong Yang
  • Zhejiang University

科研成果: 期刊稿件文章同行评审

95 引用 (Scopus)

摘要

Thrust force is an important parameter for the design and operation of earth pressure balance (EPB) shield tunneling machine. The analysis of in-situ data indicates that the conventional thrust force estimation model based on an empirical equation gives rather rough result. In order to reduce uncertainties, composition analysis and corresponding calculation of thrust force are proposed. Laboratory test with a Φ1.8 m EPB shield tunneling machine and calculation result of the new model have been compared. The new model has been improved step by step based on experimental result as well as the further analysis of the working principle of shield excavation. The relative error between the experimental thrust force and the calculation result with the final model is reduced to 3% at the smooth stage and 4% at the trembling stage. The influences of cutting ratio, hatch ratio and equivalent earth pressure on the total thrust force have been investigated.

源语言英语
页(从-至)138-146
页数9
期刊Automation in Construction
27
DOI
出版状态已出版 - 11月 2012
已对外发布

学术指纹

探究 'Modeling and analysis of thrust force for EPB shield tunneling machine' 的科研主题。它们共同构成独一无二的指纹。

引用此