Mixed integer programming based method for short-term scheduling of hydroelectric plants

  • Xi'an Jiaotong University
  • Northwest China Grid Company Limited

科研成果: 期刊稿件 › 文章 › 同行评审

3 引用 (Scopus)

摘要

The scheduling problem for short-term hydroelectric plants is studied. The nonlinear hydroelectric production functions, minimum-down/up time of hydro units, time delay between reservoirs and capacity limits of reservoirs and rivers are all considered in the model and a mixed integer programming is then formulated. Constraints on minimum-down/up time are added to prevent the units from being started-up/shut-down frequently. The nonlinear hydroelectric production functions are replaced by piecewise linear approximations and auxiliary integer variables are introduced such that the problem is re-formulated as a mixed integer linear programming. CPLEX package is adopted to solve the problem. Numerical testing results for a system with 3 reservoirs and 12 hydro units show that the model and the piecewise linear approximation techniques work well with the complex formulation of short-term hydroelectric plants scheduling.

源语言英语
页(从-至)1006-1009
页数4
期刊Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University
卷42
期8
出版状态已出版 - 8月 2008

学术指纹

探究 'Mixed integer programming based method for short-term scheduling of hydroelectric plants' 的科研主题。它们共同构成独一无二的学术指纹。

引用此