摘要
The scheduling problem for short-term hydroelectric plants is studied. The nonlinear hydroelectric production functions, minimum-down/up time of hydro units, time delay between reservoirs and capacity limits of reservoirs and rivers are all considered in the model and a mixed integer programming is then formulated. Constraints on minimum-down/up time are added to prevent the units from being started-up/shut-down frequently. The nonlinear hydroelectric production functions are replaced by piecewise linear approximations and auxiliary integer variables are introduced such that the problem is re-formulated as a mixed integer linear programming. CPLEX package is adopted to solve the problem. Numerical testing results for a system with 3 reservoirs and 12 hydro units show that the model and the piecewise linear approximation techniques work well with the complex formulation of short-term hydroelectric plants scheduling.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 1006-1009 |
| 页数 | 4 |
| 期刊 | Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University |
| 卷 | 42 |
| 期 | 8 |
| 出版状态 | 已出版 - 8月 2008 |
学术指纹
探究 'Mixed integer programming based method for short-term scheduling of hydroelectric plants' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver