T1 - Mixed backlogging and outsourcing models with inventory capacity
AU - Zhong, Jinhong
AU - Chu, Feng
AU - Chu, Chengbin
AU - Yang, Shanlin
PY - 2006
Y1 - 2006
N2 - In this paper we consider a dynamic lot sizing model with mixed backlogging and outsourcing and bounded inventory, in which outsourcing may occur in a period even if the inventory level at that period is positive. The production cost may include setup cost and the production level is unlimited. The holding, backlogging and outsourcing cost functions are linear. Furthermore, backlogging level at each period is limited, and outsourcing level at each period cannot exceed the demand of that period. The goal is to minimize the total cost of production, inventory holding/backlogging and outsourcing. We show that this problem can be solved in O(T4 log T) time where T is the length of the planning horizon. Finally, the proposed algorithm is implemented in C++ and evaluated on a large variety of instances generated randomly.
AB - In this paper we consider a dynamic lot sizing model with mixed backlogging and outsourcing and bounded inventory, in which outsourcing may occur in a period even if the inventory level at that period is positive. The production cost may include setup cost and the production level is unlimited. The holding, backlogging and outsourcing cost functions are linear. Furthermore, backlogging level at each period is limited, and outsourcing level at each period cannot exceed the demand of that period. The goal is to minimize the total cost of production, inventory holding/backlogging and outsourcing. We show that this problem can be solved in O(T4 log T) time where T is the length of the planning horizon. Finally, the proposed algorithm is implemented in C++ and evaluated on a large variety of instances generated randomly.
UR - https://www.scopus.com/pages/publications/34548128488
U2 - 10.1109/ICSMC.2006.384862
DO - 10.1109/ICSMC.2006.384862
M3 - 会议稿件
AN - SCOPUS:34548128488
SN - 1424401003
SN - 9781424401000
T3 - Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics
SP - 4546
EP - 4551
BT - 2006 IEEE International Conference on Systems, Man and Cybernetics
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2006 IEEE International Conference on Systems, Man and Cybernetics
Y2 - 8 October 2006 through 11 October 2006
ER -