跳到主要导航 跳到搜索 跳到主要内容

Minimizing total tardiness on two uniform parallel machines considering a cost constraint

  • Hefei University of Technology
  • Key Lab of the Ministry of Education for Process Control and Efficiency Egineering

科研成果: 期刊稿件文章同行评审

16 引用 (Scopus)

摘要

This paper considers a scheduling problem of processing jobs on two uniform parallel machines. The objective is to minimize total tardiness, subject to the constraint that the total cost cannot exceed a given threshold. The problem is NP-hard even if there is no constraint on machine cost. Two machines are defined, one being fast with a higher processing cost and the other being slow with a lower processing cost. A mixed integer programming (MIP) model is established for the problem. We propose two heuristics with an improvement procedure to obtain initial solutions. To improve the quality of initial solutions, an algorithm based on simulated annealing (SA) approach is developed. The performance of the proposed algorithm is tested through random data and evaluated against optimal solutions obtained by Cplex. The results indicate that the algorithm is efficient and performs well.

源语言英语
页(从-至)143-153
页数11
期刊Expert Systems with Applications
123
DOI
出版状态已出版 - 1 6月 2019
已对外发布

学术指纹

探究 'Minimizing total tardiness on two uniform parallel machines considering a cost constraint' 的科研主题。它们共同构成独一无二的指纹。

引用此