Long-term scheduling for cascaded hydro energy systems with annual water consumption and release constraints

  • Yanjia Zhao
  • , Xi Chen
  • , Qing Shan Jia
  • , Xiaohong Guan
  • , Shuanghu Zhang
  • , Yunzhong Jiang
  • Tsinghua University
  • China Institute of Water Resources and Hydropower Research

科研成果: 期刊稿件文章同行评审

27 引用 (Scopus)

摘要

Long-term scheduling for cascaded hydro energy systems is very important for low carbon energy production. It aims at determining the water release over a planning horizon to meet water resource requirements and the system demands for electric power. The problem is challenging in view of the complicated and stochastic system dynamics, nonlinear marginal cost, coupled hydraulic constraints, and the large problem size. In this paper we formulate the long-term scheduling problem of cascaded hydro energy systems with annual consumption and release constraints as a finite horizon constrained Markov decision process (CMDP), and develop a new rollout algorithm to optimize the policies. Numerical results demonstrate the effectiveness and the efficiency of the formulation and the new algorithm.

源语言英语
期刊论文编号5475356
页(从-至)969-976
页数8
期刊IEEE Transactions on Automation Science and Engineering
7
4
DOI
出版状态已出版 - 10月 2010

学术指纹

探究 'Long-term scheduling for cascaded hydro energy systems with annual water consumption and release constraints' 的科研主题。它们共同构成独一无二的学术指纹。

引用此