TY - JOUR
T1 - Integrated berth allocation and quay crane assignment with maintenance activities
AU - Zheng, Feifeng
AU - Li, Ying
AU - Chu, Feng
AU - Liu, Ming
AU - Xu, Yinfeng
N1 - Publisher Copyright:
© 2018, © 2018 Informa UK Limited, trading as Taylor & Francis Group.
PY - 2019/6/3
Y1 - 2019/6/3
N2 - With the rapid development of worldwide container trade, quay cranes and other resources in container terminals are suffering from increasing workloads. To reduce their failure probabilities, quay cranes usually require preventive maintenance. However, these important activities are often ignored during quay crane planning in literature. This work studies an integrated berth allocation, quay crane assignment and specific quay crane assignment problem where quay crane maintenance is involved, and establishes an integer linear programming with the objective of minimising the total turnaround time. Due to the NP-hardness of the problem, CPLEX only solves instances with up to 18 vessels. For solving larger instances, we propose Left-and-Right Vessel Move (LRVM) algorithm and improved Genetic Algorithm (GA). Experimental results reveal that GA slightly outperforms LRVM with respect to solution quality as the solution of LRVM serves as one of the initial chromosomes of GA. LRVM can output feasible solutions within seconds, even for instances with 50 vessels. We further present a sensitivity analysis of preferred berth segments, and make numerical comparison on algorithm performance for the relevant model without quay crane maintenance. Both the models and proposed heuristics in this work help in dealing with the operational management of container terminal resources in practice.
AB - With the rapid development of worldwide container trade, quay cranes and other resources in container terminals are suffering from increasing workloads. To reduce their failure probabilities, quay cranes usually require preventive maintenance. However, these important activities are often ignored during quay crane planning in literature. This work studies an integrated berth allocation, quay crane assignment and specific quay crane assignment problem where quay crane maintenance is involved, and establishes an integer linear programming with the objective of minimising the total turnaround time. Due to the NP-hardness of the problem, CPLEX only solves instances with up to 18 vessels. For solving larger instances, we propose Left-and-Right Vessel Move (LRVM) algorithm and improved Genetic Algorithm (GA). Experimental results reveal that GA slightly outperforms LRVM with respect to solution quality as the solution of LRVM serves as one of the initial chromosomes of GA. LRVM can output feasible solutions within seconds, even for instances with 50 vessels. We further present a sensitivity analysis of preferred berth segments, and make numerical comparison on algorithm performance for the relevant model without quay crane maintenance. Both the models and proposed heuristics in this work help in dealing with the operational management of container terminal resources in practice.
KW - berth allocation
KW - genetic algorithm
KW - integer linear programming
KW - maintenance activities
KW - quay crane assignment
UR - https://www.scopus.com/pages/publications/85056090296
U2 - 10.1080/00207543.2018.1539265
DO - 10.1080/00207543.2018.1539265
M3 - 文章
AN - SCOPUS:85056090296
SN - 0020-7543
VL - 57
SP - 3478
EP - 3503
JO - International Journal of Production Research
JF - International Journal of Production Research
IS - 11
ER -