跳到主要导航 跳到搜索 跳到主要内容

High-speed train speed estimation via one geophone near an high-speed railway

  • China Coal Research Institute
  • Xi'an Jiaotong University

科研成果: 期刊稿件会议文章同行评审

1 引用 (Scopus)

摘要

The running high-speed train (HST) stimulates various seismic waves near a high-speed railway (HSR) when it runs on an HSR. Thus the received seismic signal can be further utilized to estimate the HST speed without using any onboard device. Based on the assumption that every carriage of the HST has the same structure, this abstract introduces one convolution model for the track load function and shows the track load function's amplitude spectrum has an equal-interval and multi-narrowband feature. Furthermore, it can be indicated that the HST speed and carriage length determines the interval between two neighboring frequency peaks. Therefore, with only one geophone near the HSR, we propose one robust HST speed estimating method by computing an auto-correlation function of the received signal's amplitude spectrum. The advantage of the proposed method is its robustness, low computation cost, easy implementation, and need only one geophone. One experimental field results show the proposed method's ability to estimate the speed of a passing HST.

源语言英语
页(从-至)3230-3234
页数5
期刊SEG Technical Program Expanded Abstracts
2021-September
DOI
出版状态已出版 - 2021
活动1st International Meeting for Applied Geoscience and Energy - Denver, 美国
期限: 26 9月 20211 10月 2021

学术指纹

探究 'High-speed train speed estimation via one geophone near an high-speed railway' 的科研主题。它们共同构成独一无二的指纹。

引用此