Electricity cost constitutes an important part of the total energy cost for some energy-intensive industries (EIIs). For enterprises belonging to such EIIs, an effective way to reduce the electricity cost is to integrate the renewable energy such as wind and/or photovoltaic energy into their energy systems. In this paper, the problem of generation scheduling of self-generation power plant (SGPP) in EII microgrid with wind power is considered. First, a robust optimization-based formulation with flexible uncertainty set is established to obtain the feasible range of SGPP outputs, which can ensure the robustness and nonanticipativity of the system. Second, the economic dispatch (ED) model based on the feasible range is proposed and the multi-period scheduling problem is decoupled into a series of single-period ED problems. Besides, the analytical solution to the ED problem is given and thus the computational efficiency is guaranteed. Numerical testing is performed for a real system and the results show that the method is effective.

源语言英语
期刊论文编号8667653
页(从-至)758-770
页数13
期刊IEEE Transactions on Sustainable Energy
卷11
期2
DOI
出版状态已出版 - 4月 2020

联合国可持续发展目标

此成果有助于实现下列可持续发展目标:

  1. 可持续发展目标 7 - 经济适用的清洁能源
    可持续发展目标 7 经济适用的清洁能源

学术指纹

探究 'Generation scheduling of self-generation power plant in enterprise microgrid with wind power and gateway power bound limits' 的科研主题。它们共同构成独一无二的学术指纹。

引用此