摘要
This paper presents a controller design study for the supercritical coal fired power plant (CFPP) integrated with solvent-based post-combustion CO2 capture (PCC) system. The focus of the study is on the steam drawn-off from turbine to the re-boiler, which is the key interaction between the CFPP and PCC plants. The simulation study of a 660 MW supercritical CFPP-PCC unit model has shown that the impact of re-boiler steam change on the power generation of CFPP is more than 100 times faster than that on the PCC operation. Considering this finding, a collaborative predictive control strategy is proposed for the CFPP-PCC system where the re-boiler steam flowrate is manipulated for the CFPP load ramping and then gradually set to the required value for CO2 capture. The PCC is thereby exploited as an energy storage device, which can quickly store/release extra energy for the CFPP in addition to the primary function of carbon emission reduction. The simulation results show that the proposed collaborative predictive controller can effectively improve the load ramping performance of CFPP without much performance degradation on the PCC operation.
| 源语言 | 英语 |
|---|---|
| 期刊论文编号 | 118105 |
| 期刊 | Energy |
| 卷 | 206 |
| DOI | |
| 出版状态 | 已出版 - 1 9月 2020 |
| 已对外发布 | 是 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'Flexible operation of supercritical coal-fired power plant integrated with solvent-based CO2 capture through collaborative predictive control' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver