摘要
The generation schedules obtained in traditional hydrothermal scheduling or unit commitment programs are in hourly generation levels. In the new deregulated power market, the power transactions are processed in terms of hourly energy delivery. Failing to fulfill scheduled energy delivery may result in penalty to power producers. This paper shows that although ramp-rate constraints are satisfied in hydrothermal scheduling, taking a generation level schedule as an energy delivery schedule may not be realizable. Based on the Maximum Principle in optimal control theory, the energy delivery capacity across the scheduling horizon is established as a set of recursive equations with given ramp-rate constraints. A sufficient and necessary condition is obtained to check if an energy delivery schedule is realizable. Based on this condition, two cases, where ramp-rate constraints are both satisfied, are analyzed and an unrealizable energy delivery schedule is observed.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 1275-1280 |
| 页数 | 6 |
| 期刊 | IEEE Transactions on Power Systems |
| 卷 | 15 |
| 期 | 4 |
| DOI | |
| 出版状态 | 已出版 - 2000 |
学术指纹
探究 'Energydelivery capacity and generation scheduling in the deregulated electric power market' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver