摘要
With the development of power market and large-scale renewable energy(RE) integration into power system in China, the execution planning of long and middle term energy contract has great challenges due to a high proportion of contract power and uncertainty of RE generation. To decrease the risk of unfinished contract or RE abandonment caused by the characteristics of different power types, the relative equilibrium contract completion rate that can be extended to all types of power plants is introduced in the basic decomposition model of energy contract. Then, the start-up and shutdown of thermal power plant in a short-time period are considered in the energy decomposition model of monthly contract. Further, in order to consider the uncertainties of new energy, chance constraints are introduced in the model. Finally, a numerical example based on a real system of a province of China verifies the reasonableness of the proposed model.
| 源语言 | 英语 |
|---|---|
| 主期刊名 | 2019 IEEE PES Innovative Smart Grid Technologies Asia, ISGT 2019 |
| 出版商 | Institute of Electrical and Electronics Engineers Inc. |
| 页 | 3735-3740 |
| 页数 | 6 |
| ISBN(电子版) | 9781728135205 |
| DOI | |
| 出版状态 | 已出版 - 5月 2019 |
| 活动 | 2019 IEEE PES Innovative Smart Grid Technologies Asia, ISGT 2019 - Chengdu, 中国 期限: 21 5月 2019 → 24 5月 2019 |
出版系列
| 姓名 | 2019 IEEE PES Innovative Smart Grid Technologies Asia, ISGT 2019 |
|---|
会议
| 会议 | 2019 IEEE PES Innovative Smart Grid Technologies Asia, ISGT 2019 |
|---|---|
| 国家/地区 | 中国 |
| 市 | Chengdu |
| 时期 | 21/05/19 → 24/05/19 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'Energy Decomposition of Long and Middle Term Contract in Multi-Energy System' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver