Duration/cost trade-offs in project scheduling with time-switch constraints

  • Northwestern Polytechnical University Xian
  • Xi'an Jiaotong University

科研成果: 书/报告/会议事项章节 › 会议稿件 › 同行评审

摘要

The time-switch constraints attract less attention in the discrete time/cost trade-off problems (DTCTP, for short), but these constraints impose specific starting time on the project activities and force them to be active and inactive during specific time periods. Therefore, a more realistic optimization model is set up in this paper, which is the discrete duration/cost trade-offs in project scheduling with time-switch constraints (DDCTPTSC, for short), and then solve the DDCTPTSC by a customization heuristic genetic algorithm. Combining a real-life project example, the analysis results show that time-switch constraints' impacts on project indirect cost, penalty cost and bonus cost are mostly different from the traditional DTCTP model because of time-switch constraints, moreover, from the viewpoints of both contractors and clients respectively, we discuss that the penalty/bonus intensity makes the effects on both deciding behaviors, the obtained conclusions provide the instructive meaning for them in the project's negotiation.

源语言英语
主期刊名Proceedings of 2006 International Conference on Management Science and Engineering, ICMSE'06 (13th)
出版商Institute of Electrical and Electronics Engineers Inc.
页313-317
页数5
ISBN(印刷版)7560323553, 9787560323558
DOI
出版状态已出版 - 2006
活动2006 International Conference on Management Science and Engineering, ICMSE'06 - Lille, 法国
期限: 5 10月 2006 → 7 10月 2006

丛书

姓名Proceedings of 2006 International Conference on Management Science and Engineering, ICMSE'06 (13th)

会议

会议2006 International Conference on Management Science and Engineering, ICMSE'06
国家/地区法国
市Lille
时期5/10/06 → 7/10/06