摘要
The rapid growth of renewable energy sources brings great challenges to the economic dispatch of the modern power system. Retrofitting thermal power plants with thermal energy storage (TES) can improve the operational flexibility of the plants to handle the uncertainty of renewable energy sources. An economic dispatch model which considers retrofitted coal-fired power plants with thermal energy storage is proposed to promote the proliferation of uncertain renewable energy resources. A multi-stage stochastic programming (MSSP) model is constructed to accommodate the uncertainties of renewable energy resources, which provides a higher level of flexibility as compared with the traditional two-stage stochastic programming solutions. In addition, dual stochastic dual dynamic programming is employed, and a new policy is proposed to enhance the computational efficiency of the proposed MSSP model. Numerical results for a practical regional power system in China are presented and analyzed to verify the effectiveness of the proposed solution method for the economic dispatch model.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 3725-3737 |
| 页数 | 13 |
| 期刊 | IEEE Transactions on Power Systems |
| 卷 | 39 |
| 期 | 2 |
| DOI | |
| 出版状态 | 已出版 - 1 3月 2024 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'Dual Stochastic Dual Dynamic Programming for Multi-Stage Economic Dispatch with Renewable Energy and Thermal Energy Storage' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver