摘要
The solar chimney power plant (SCPP) is dominated by the solar radiation, and therefore its discontinuous operation is an unavoidable problem. In this paper, low temperature geothermal energy is introduced into the SCPP for overcoming this problem. Based on a developed mathematical model, theoretical analyses are carried out to investigate the performance of the geothermal-solar chimney power plant (GSCPP) with main dimensions the same as the Manzanares prototype in Spain. It is found that the GSCPP can attractively run in the full geothermal mode to deliver power continuously, which could solve the problem of the SCPP's running without sunlight in a long time, including at night. In addition, the introducing of geothermal energy into the SCPP can highly improve its power capacity.
| 源语言 | 英语 |
|---|---|
| 出版状态 | 已出版 - 2013 |
| 活动 | 26th International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems, ECOS 2013 - Guilin, 中国 期限: 16 7月 2013 → 19 7月 2013 |
会议
| 会议 | 26th International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems, ECOS 2013 |
|---|---|
| 国家/地区 | 中国 |
| 市 | Guilin |
| 时期 | 16/07/13 → 19/07/13 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'Design and simulation of a novel geothermalsolar combined chimney power plant' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver