Delay Analysis and Compensation for Digital MSOGI-QSG Implementation in Back-To-Back Interfacing Converter between Microgrid and Utility Grid for Harmonic Extraction

  • Yai Pioth Yai Deng
  • , Jinjun Liu
  • , Md Omar Faruque
  • , Sastry Pamidi
  • Xi'an Jiaotong University
  • Florida State University

科研成果: 书/报告/会议事项章节 › 会议稿件 › 同行评审

摘要

Due to its ability to detect different harmonic components in highly polluted grid conditions and harmonics induced into the microgrid point of common coupling (PCC) bus by nonlinear loads, the multiple second-order generalized integrator-quadrature signal generator (MSOGI-QSG) is widely used in domains like grid synchronization and signal extraction. However, it typically suffers from an ac discretization error problem in digital implementation. The impact of unit delay in cross feedback to break algebraic loops in digital implementation is investigated in this paper, and it is discovered that uncompensated delay causes steady-state errors even if individual second-order generalized integrator-quadrature signal generator (SOGI-QSG) discretization is accurate. Based on the findings, a simple and effective rotational transformation-based compensation method is proposed, which considerably enhances the accuracy of signal extraction and frequency estimation when used in conjunction with a frequency-locked loop (FLL). The proposed method is validated through experimental results.

源语言英语
主期刊名2022 IEEE Industrial Electronics and Applications Conference, IEACon 2022
出版商Institute of Electrical and Electronics Engineers Inc.
页163-168
页数6
ISBN(电子版)9781665480062
DOI
出版状态已出版 - 2022
已对外发布是
活动3rd IEEE Industrial Electronics and Applications Conference, IEACon 2022 - Virtual, Online, 马来西亚
期限: 3 10月 2022 → 4 10月 2022

出版系列

姓名2022 IEEE Industrial Electronics and Applications Conference, IEACon 2022

会议

会议3rd IEEE Industrial Electronics and Applications Conference, IEACon 2022
国家/地区马来西亚
市Virtual, Online
时期3/10/22 → 4/10/22

学术指纹

探究 'Delay Analysis and Compensation for Digital MSOGI-QSG Implementation in Back-To-Back Interfacing Converter between Microgrid and Utility Grid for Harmonic Extraction' 的科研主题。它们共同构成独一无二的学术指纹。

引用此