摘要
This paper presents a day-ahead coordinated scheduling method of hydro and wind power generation systems (HWPGSs) with consideration of uncertainties. In this method, we first formulate the coordinated scheduling model with two-part price and power flow constraints, which manifests the fixed and variable economic benefits as well as the secure operation of HWPGS, respectively. Then, the interval analysis is used to study the effect of uncertain wind power, water inflow, and electricity load on the coordinated scheduling model. Finally, we use a real test system in a western area of China to conduct simulation studies, which verify the effectiveness of the interval analysis and the effect of price mechanism on the day-ahead coordinated scheduling of HWPGS.
| 源语言 | 英语 |
|---|---|
| 期刊论文编号 | 8616783 |
| 页(从-至) | 2368-2377 |
| 页数 | 10 |
| 期刊 | IEEE Transactions on Industry Applications |
| 卷 | 55 |
| 期 | 3 |
| DOI | |
| 出版状态 | 已出版 - 1 5月 2019 |
| 已对外发布 | 是 |
学术指纹
探究 'Day-ahead coordinated scheduling of hydro and wind power generation system considering uncertainties' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver