跳到主要导航 跳到搜索 跳到主要内容

Corrigendum to “Dynamic Modeling Framework of Sediment Trapped by Check-Dam Networks: A Case Study of a Typical Watershed on the Chinese Loess Plateau” [Engineering 27 (2023) 209–221, (S2095809922000741), (10.1016/j.eng.2021.12.015)]

  • Ministry of Natural Resources of the People's Republic of China
  • Ministry of Water Resources, P.R. China
  • Xi'an Jiaotong University

科研成果: 期刊稿件评论/辩论

1 引用 (Scopus)

摘要

The authors regret to inform that several numbers are mistaken due to clerical errors. In Section 3.1, paragraph 1, “The total storage of check dams in the YanRB reached 3.5 × 1011 m3 by the end of 2008, bringing great sediment trapping potential in this region.” where “1011” should be “108.” The correct expression appears below. “The total storage of check dams in the YanRB reached 3.5 × 108 m3 by the end of 2008, bringing great sediment trapping potential in this region.” Correspondingly, the unit in Fig. 6(c) should be “m3” instead of “km3.” The corrected Fig. 6 is provided as below.[Formula

源语言英语
页(从-至)246
页数1
期刊Engineering
37
DOI
出版状态已出版 - 6月 2024

引用此