跳到主要导航 跳到搜索 跳到主要内容

Calculations of high-power production target and beamdump for the GSI future Super-FRS for a fast extraction scheme at the FAIR Facility

  • N. A. Tahir
  • , H. Weick
  • , H. Iwase
  • , H. Geissel
  • , D. H.H. Hoffmann
  • , B. Kindler
  • , B. Lommel
  • , T. Radon
  • , G. Münzenberg
  • , A. Shutov
  • , K. Sümmerer
  • , M. Winkler
  • GSI Helmholtz Centre for Heavy Ion Research
  • Justus Liebig University Giessen
  • Technische Universität Darmstadt
  • Johannes Gutenberg University Mainz
  • Institute for Chemical Physics Research

科研成果: 期刊稿件 › 文章 › 同行评审

18 引用 (Scopus)

摘要

A superconducting fragment separator (Super-FRS) was designed to carry out experiments on the production and separation of rare radioactive isotopes at the future FAIR (Facility for Antiprotons and Ion Research) facility at Darmstadt. The calculations of a proposed high-power production target for the Super-FRS using a fast extraction scheme. The production target has to be used over an extended period of time and therefore it must survive successive irradiations by the primary ion beam. The calculations show that special care must be taken to avoid serious equipment damage in case of an accident while operating with such powerful beams.

源语言英语
页(从-至)1828-1837
页数10
期刊Journal of Physics D: Applied Physics
卷38
期11
DOI
出版状态已出版 - 7 6月 2005
已对外发布是

学术指纹

探究 'Calculations of high-power production target and beamdump for the GSI future Super-FRS for a fast extraction scheme at the FAIR Facility' 的科研主题。它们共同构成独一无二的学术指纹。

引用此