跳到主要导航 跳到搜索 跳到主要内容

Balancing manual mixed-model assembly lines using overtime work in a demand variation environment

  • Xi'an Jiaotong University

科研成果: 期刊稿件 › 文章 › 同行评审

38 引用 (Scopus)

摘要

This study deals with the balancing problem of a manual mixed-model assembly line, where the production volume or the product mix changes from shift to shift during the planning horizon. The unstable demand can be characterised by several representative scenarios, and the line uses overtime work to meet the demand variation. The balancing problem concerns how to assign assembly tasks to stations and determine the amount of overtime in each possible demand scenario. The objective is to satisfy the demand in each possible scenario with the minimum labour costs paid for both normal shifts and overtime work. A lower bound on the labour costs is proposed, and a heuristic algorithm is developed to quickly find a feasible solution. A branch, bound and remember (BB&R) algorithm is then proposed to find better solutions. These solution methods are tested on 765 instances. The BB&R algorithm obtains optimal solutions for 510 instances and gives high-quality solutions for the remaining 255 instances within 60 s. The experimental results show that the use of overtime work and adjustable cycle times significantly reduces the labour costs, especially when the demand or task processing time variations are large.

源语言英语
页(从-至)3552-3567
页数16
期刊International Journal of Production Research
卷52
期12
DOI
出版状态已出版 - 2014

学术指纹

探究 'Balancing manual mixed-model assembly lines using overtime work in a demand variation environment' 的科研主题。它们共同构成独一无二的学术指纹。

引用此