摘要
Motivated by applications in food processing and semiconductor manufacturing industries, we consider the scheduling problem of a batching machine with jobs of multiple families. The machine has a limited capacity to accommodate jobs. The jobs are in arbitrary sizes and multiple families. Jobs from different families cannot be processed in a batch. We show the problems of minimizing makespan and total batch completion time are both NP-hard in the strong sense. We present a mixed integer programming model for the problems. Then we propose two polynomial time heuristics based on longest processing time first rule and first fit rule. For the special case where a larger job also has a longer processing time, the heuristic for minimizing makespan is optimal. For the general case, we show the performance guarantee of the methods for the two objectives respectively.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 116-120 |
| 页数 | 5 |
| 期刊 | Computers and Industrial Engineering |
| 卷 | 75 |
| 期 | 1 |
| DOI | |
| 出版状态 | 已出版 - 9月 2014 |
| 已对外发布 | 是 |
学术指纹
探究 'Algorithms for scheduling incompatible job families on single batching machine with limited capacity' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver