摘要
The optimization problems during the production scheduling and manufacturing process are analyzed from the view of cost control, system requirements and structure. The optimization and decision model and its solution for multi-profile, tapered, multi-species combination of material are proposed. The optimization and decision model and its solution for not fully consistent multi-species production lines operating schedule are also suggested, and the machines with sequence dependent setup time scheduling optimization of production model with solution are also given. Furthermore, the architecture of agile manufacturing process optimization and manufacturing execution systems is constructed in the paper.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 181-186 |
| 页数 | 6 |
| 期刊 | Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice |
| 卷 | 31 |
| 期 | SUPPL. 1 |
| 出版状态 | 已出版 - 10月 2011 |
| 已对外发布 | 是 |
学术指纹
探究 'Agile manufacturing process optimization and manufacturing execution systems' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver