TY - JOUR
T1 - A variable neighborhood search algorithm for human resource selection and optimization problem in the home appliance manufacturing industry
AU - Ji, Xing
AU - Liao, Baoyu
AU - Yang, Shanlin
N1 - Publisher Copyright:
© 2021, The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature.
PY - 2022/8
Y1 - 2022/8
N2 - The increase in human resource cost puts forward higher requirements for the optimization of home appliance manufacturing processes. This paper studied an integrated human resource optimization problem considering the human resource selection, learning effect, skills degradation effect, and parallel production lines. There are multiple different manufacturing tasks with different normal processing times. Human resources have different abilities and costs. The actual processing time of a task is determined by its normal processing time, position, and ability of the human resource. The objective is to minimize production time and the labor cost. To solve the studied problem, we first consider the case where the human resources have been selected and assigned to the production lines. Then, some structural properties are proposed and a heuristic is developed to arrange tasks on every single production line. Also, we derive a lower bound for the problem. Since the investigated problem is NP-hard, a Variable Neighborhood Search is designed to solve the problem in a reasonable time. Finally, computational experiments are conducted and the experimental results validate the performance of the proposed methods.
AB - The increase in human resource cost puts forward higher requirements for the optimization of home appliance manufacturing processes. This paper studied an integrated human resource optimization problem considering the human resource selection, learning effect, skills degradation effect, and parallel production lines. There are multiple different manufacturing tasks with different normal processing times. Human resources have different abilities and costs. The actual processing time of a task is determined by its normal processing time, position, and ability of the human resource. The objective is to minimize production time and the labor cost. To solve the studied problem, we first consider the case where the human resources have been selected and assigned to the production lines. Then, some structural properties are proposed and a heuristic is developed to arrange tasks on every single production line. Also, we derive a lower bound for the problem. Since the investigated problem is NP-hard, a Variable Neighborhood Search is designed to solve the problem in a reasonable time. Finally, computational experiments are conducted and the experimental results validate the performance of the proposed methods.
KW - Human resource optimization
KW - Learning effect
KW - Parallel production lines
KW - Skills degradation effect
KW - Variable neighborhood search
UR - https://www.scopus.com/pages/publications/85118240614
U2 - 10.1007/s10878-021-00809-y
DO - 10.1007/s10878-021-00809-y
M3 - 文章
AN - SCOPUS:85118240614
SN - 1382-6905
VL - 44
SP - 223
EP - 241
JO - Journal of Combinatorial Optimization
JF - Journal of Combinatorial Optimization
IS - 1
ER -