A necessary and sufficient condition for obtaining feasible solution to hydro power scheduling with multiple operating zones

  • IEEE
  • Tsinghua University
  • Xi'an Jiaotong University

科研成果: 书/报告/会议事项章节会议稿件同行评审

7 引用 (Scopus)

摘要

Hydro generation scheduling with complicated discrete dynamic operating constraints and multiple operating zones is extremely difficult. One of the most important problems is to identify the feasibility of a hydro unit commitment and to construct a feasible solution efficiently. This paper focuses addressing the issues of the hydro generation scheduling problem with a single hydroelectric plant and several units and multiple operating zones. Based on analysis of the structure of water conservation equations, a necessary and sufficient condition on the problem feasibility is presented and is applied in constructing feasible solution as efficient tool. Its application for generating efficient cutting planes in mixed integer programming problem is discussed. The theoretical results are also validated by numerical examples.

源语言英语
主期刊名2007 IEEE Power Engineering Society General Meeting, PES
DOI
出版状态已出版 - 2007
活动2007 IEEE Power Engineering Society General Meeting, PES - Tampa, FL, 美国
期限: 24 6月 200728 6月 2007

丛书

姓名2007 IEEE Power Engineering Society General Meeting, PES

会议

会议2007 IEEE Power Engineering Society General Meeting, PES
国家/地区美国
Tampa, FL
时期24/06/0728/06/07

学术指纹

探究 'A necessary and sufficient condition for obtaining feasible solution to hydro power scheduling with multiple operating zones' 的科研主题。它们共同构成独一无二的学术指纹。

引用此