跳到主要导航 跳到搜索 跳到主要内容

A hybrid algorithm for scheduling in job shop problem with flexible resources

  • Xi'an Jiaotong University

科研成果: 书/报告/会议事项章节 › 会议稿件 › 同行评审

2 引用 (Scopus)

摘要

Flexible resource has become very important in today's competitive environment. The improvements in manufacturing efficiency can be achieved by the use of optimal scheduling to max the potential power of flexible resource. In this paper, we formulate the Job Shop Flexible Resource Scheduling (JSFRS) problem in which the job operation processing times depend on the amount of resource assigned to an operation and review the main idea of Nested Partitions (NP) framework. Based on the model for JSFRS problem, we present a hybrid algorithm via Nested Partitions to solve it. In the hybrid algorithm, the JSFRS problem is considered as a partition tree. And use the generic partition strategy for effectively concentrating the sampling effort in those subsets of feasible regions. Genetic algorithm (GA) search and heuristic resource allocation strategy are incorporated into the sampling procedure, and we use the sample points to estimate the promising index of each region. Numerical examples are also presented to illustrate the hybrid approach.

源语言英语
主期刊名2010 8th IEEE International Conference on Control and Automation, ICCA 2010
页1467-1472
页数6
DOI
出版状态已出版 - 2010
活动2010 8th IEEE International Conference on Control and Automation, ICCA 2010 - Xiamen, 中国
期限: 9 6月 2010 → 11 6月 2010

丛书

姓名2010 8th IEEE International Conference on Control and Automation, ICCA 2010

会议

会议2010 8th IEEE International Conference on Control and Automation, ICCA 2010
国家/地区中国
市Xiamen
时期9/06/10 → 11/06/10

学术指纹

探究 'A hybrid algorithm for scheduling in job shop problem with flexible resources' 的科研主题。它们共同构成独一无二的学术指纹。

引用此