摘要
The generator start-up problem is a multi-stage, multi-constraint, multi-objective, nonlinear and discrete complex combinatorial optimization problem. Firstly, this paper considers four research objects of unit, grid, load and line, and puts forward four corresponding evaluation indicators. With the relevant constraints considered, the multi-objective generator start-up strategy model with preference is built. The r-NSGA-II algorithm that used in preference optimization theory is presented to optimize the multi-objective generator start-up model with preference. Finally, by comparing the optimal solution of multiple Pareto, the best unit recovery order and recovery line path are selected. The model and algorithm validity presented in this paper are verified by the test system.
| 源语言 | 英语 |
|---|---|
| 主期刊名 | 2022 International Conference on Mechanical Engineering and Power Engineering, MEPE 2022 |
| 出版商 | Institute of Electrical and Electronics Engineers Inc. |
| 页 | 79-84 |
| 页数 | 6 |
| ISBN(电子版) | 9781665491280 |
| DOI | |
| 出版状态 | 已出版 - 2022 |
| 活动 | 2022 International Conference on Mechanical Engineering and Power Engineering, MEPE 2022 - Virtual, Online, 中国 期限: 27 12月 2022 → 29 12月 2022 |
出版系列
| 姓名 | 2022 International Conference on Mechanical Engineering and Power Engineering, MEPE 2022 |
|---|
会议
| 会议 | 2022 International Conference on Mechanical Engineering and Power Engineering, MEPE 2022 |
|---|---|
| 国家/地区 | 中国 |
| 市 | Virtual, Online |
| 时期 | 27/12/22 → 29/12/22 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源