The substation fault will lead to the paralysis of distribution network within the supply area,resulting in widespread power outage. Therefore,a substation-distribution network cooperative fault recovery method considering quickly-detachable transformer is proposed. A fault recovery framework under the application of quickly-detachable transformer is constructed,the recovery mechanism of transformer in the substation is elucidated. A“transport-repair”two-stage recovery strategy is proposed,which covers three types of faults of quickly-detachable transformer faults,line faults,and small distribution transformer faults. Considering the network reconfiguration,an optimization model for substation-distribution network fault recovery is established,and the generalized Benders decomposition algorithm is used for solution. The simulation is carried out based on a modified 141-node distribution network example to validate the effectiveness of the proposed method. The simulative results show that the proposed method can effectively shorten the fault recovery time of substation-distribution network system,improve the load recovery rate,and has higher solving efficiency.
| 投稿的翻译标题 | Substation-distribution network cooperative fault recovery method considering quickly-detachable transformer |
|---|---|
| 源语言 | 繁体中文 |
| 页(从-至) | 100-109 |
| 页数 | 10 |
| 期刊 | Dianli Zidonghua Shebei/Electric Power Automation Equipment |
| 卷 | 45 |
| 期 | 10 |
| DOI | |
| 出版状态 | 已出版 - 10月 2025 |
关键词
- distribution network
- fault recovery
- line repair
- quickly-detachable transformer
- substation
学术指纹
探究 '考虑快速可拆卸变压器的变电站-配电网协同故障恢复方法' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver