TY - JOUR
T1 - Wind power accommodation capability considering economic constraints for western mountain areas
AU - Liu, Wenxia
AU - Li, Yingzhi
AU - Li, He
AU - Zhao, Tianyang
AU - Zhang, Jianhua
PY - 2014/8/10
Y1 - 2014/8/10
N2 - The cost benefits of both wind farm and grid caused by the integration of wind power into grid, as well as the environmental benefit, are quantitatively analyzed, and an optimization model of wind power accommodation is built, which takes the economical efficiency as its objective and considers the constraints of profitability and operational security. The differential evolution algorithm is adopted to solve the model. With RTS79 as an example, the proposed wind power planning method is compared to the traditional one, which considers only the technical factors, and analysis indicates that, the proposed method has smaller wind power accommodation capability but better economy, verifying its effectiveness and practicability.
AB - The cost benefits of both wind farm and grid caused by the integration of wind power into grid, as well as the environmental benefit, are quantitatively analyzed, and an optimization model of wind power accommodation is built, which takes the economical efficiency as its objective and considers the constraints of profitability and operational security. The differential evolution algorithm is adopted to solve the model. With RTS79 as an example, the proposed wind power planning method is compared to the traditional one, which considers only the technical factors, and analysis indicates that, the proposed method has smaller wind power accommodation capability but better economy, verifying its effectiveness and practicability.
KW - Cost-benefit analysis
KW - Differential evolution algorithm
KW - Economic analysis
KW - Environmental benefits
KW - Models
KW - Optimization
KW - Wind power
KW - Wind power accommodation capability
UR - https://www.scopus.com/pages/publications/84906837009
U2 - 10.3969/j.issn.1006-6047.2014.08.004
DO - 10.3969/j.issn.1006-6047.2014.08.004
M3 - 文章
AN - SCOPUS:84906837009
SN - 1006-6047
VL - 34
SP - 19-24 and 30
JO - Dianli Zidonghua Shebei/Electric Power Automation Equipment
JF - Dianli Zidonghua Shebei/Electric Power Automation Equipment
IS - 8
ER -