Abstract
The present work discussed the single-phase water hammer phenomenon, which was caused by the four-pump-alternate startup in an integral pressurized water reactor (IPWR). A new code named water hammer program (WAHAP) was developed independently based on the method of characteristic to simulate hydraulic transients in the primary system of IPWR and its components such as reactor core, once-through steam generators (OTSG), the main coolant pumps and so on. Experimental validation for the correctness of the equations and models in WAHAP was carried out and the models fit the experimental data well. Some important variables were monitored including transient volume flow rates, opening angle of valve disc and pressure drop in valves. The water hammer commercial software Flowmaster V7 was also employed to compare with WAHAP and the good agreement can validate the equations in WAHAP. The transient results indicated that the primary loop of IPWR suffers from slight water hammer impact under pump switching conditions.
| Original language | English |
|---|---|
| Pages (from-to) | 165-173 |
| Number of pages | 9 |
| Journal | Nuclear Engineering and Design |
| Volume | 261 |
| DOIs | |
| State | Published - 2013 |
Keywords
- Water hammer Integral pressurized water reactor Method of characteristic Experimental verification Flowmaster
Fingerprint
Dive into the research topics of 'Water hammer characteristics of integral pressurized water reactor primary loop'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver