Abstract
Repair and reconfiguration are vital for power recovery after outages caused by natural disasters in distribution systems, but sequential and uncertainty-inflicted decision points due to uncertain repair periods make power recovery complicated. This paper proposes semi-Markov decision process (SMDP)-based resilient recovery with sequentially event-driven repair and reconfiguration in consideration of uncertainty-inflicted decision-making points. The sequential repair/reconfiguration actions in consideration of uncertain repair periods are considered as uncertainty-inflicted event-driven processes. The sequential repair states with different repair crews are established as semi-Markov states. The whole sequential and uncertain decision-making process is modeled as a semi-Markov decision process-based optimization model, which is an event-driven recursive model. Q-learning is employed to solve the proposed model, and the convergent estimations of Q values for semi-Markov states map the original model into an event-driven deterministic optimization based on the sequential repairs that actually occurred over the time horizon. IEEE 123-bus system is used to validate the proposed model.
| Original language | English |
|---|---|
| Pages (from-to) | 368-380 |
| Number of pages | 13 |
| Journal | IEEE Transactions on Power Systems |
| Volume | 40 |
| Issue number | 1 |
| DOIs | |
| State | Published - 2025 |
Keywords
- Repair
- resilient recovery
- semi-Markov decision process
- uncertain decision-making
Fingerprint
Dive into the research topics of 'Uncertainty-Inflicted Event-Driven Resilient Recovery for Distribution Systems: A Semi-Markov Decision Process Approach'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver