Skip to main navigation Skip to search Skip to main content

Transient liquid leakage during plunger lifting process in gas wells

  • Xi'an Jiaotong University

Research output: Contribution to journalArticlepeer-review

19 Scopus citations

Abstract

Plunger lift is an economical method to solve the liquid loading problem in wells. Following our previous research (Zhao et al., 2018), which focused on the steady-state process of liquid leakage during lifting, the transient variations of plunger velocity, liquid leakage and stress conditions during plunger lifting process are investigated theoretically and experimentally in this paper. Based on the force analysis and finite difference method, the transient physical model for the mass and gas volume fraction of gas-liquid column above plunger is proposed. Combining the similarity experiments and infrared measuring technology, the proposed transient model is verified quantitatively with the relative deviation less than ±10%. The results show that both the liquid leakage and the gas volume fraction of gas-liquid column above plunger cannot be neglected during plunger lifting. The transient change rules of lifting differential pressure, plunger velocity, gas volume fraction of gas-liquid column and liquid leakage flow rate during lifting process are obtained. The influences of liquid loading condition and gas production rate on transient plunger lifting process are discussed. Through the dimensionless analysis, a dimensionless correlation for transient gas volume fraction of gas-liquid column is developed.

Original languageEnglish
Pages (from-to)250-261
Number of pages12
JournalJournal of Natural Gas Science and Engineering
Volume59
DOIs
StatePublished - Nov 2018

Keywords

  • Gas volume fraction
  • Liquid leakage
  • Plunger lift
  • Transient process

Fingerprint

Dive into the research topics of 'Transient liquid leakage during plunger lifting process in gas wells'. Together they form a unique fingerprint.

Cite this