TY - GEN
T1 - Transient Analysis on Transfer Process of Hybrid Soft Open Point under Power Grid Outage
AU - Lai, Zhenhong
AU - Zhang, Xiao
AU - Yi, Hao
AU - Fu, Kang
AU - Zhuo, Fang
AU - Zhao, Kexv
N1 - Publisher Copyright:
© 2022 IEEE.
PY - 2022
Y1 - 2022
N2 - Back-to-back (B2B) converter is adopted widely in soft open point(SOP) to improve the flexibility of distribution system and support the voltage of critical load under power grid outage. However, B2B converter has the drawbacks of large volume and high cost. Therefore, the hybrid SOP is introduced in this paper, which is composed of an interconnection switch and B2B converter with smaller capacity. The transfer process of how hybrid SOP changes into supporting load voltage when power grid outage occurs. To guarantee the continuous power supply of critical load, the transient short-circuit loop is inevitable in the hybrid SOP during transfer process. Based on the equivalent circuit, the transient current is calculated, according to which two kind of control strategies for converter at outage side to power all the loads are proposed. With the proposed method, the duration time that converter powers full the loads alone decreases and the overcurrent can also be restrained. Two kinds of control strategies are compared from the respects of stability and overcurrent suppression in simulation. The simulation results of the whole transfer process are provided as well.
AB - Back-to-back (B2B) converter is adopted widely in soft open point(SOP) to improve the flexibility of distribution system and support the voltage of critical load under power grid outage. However, B2B converter has the drawbacks of large volume and high cost. Therefore, the hybrid SOP is introduced in this paper, which is composed of an interconnection switch and B2B converter with smaller capacity. The transfer process of how hybrid SOP changes into supporting load voltage when power grid outage occurs. To guarantee the continuous power supply of critical load, the transient short-circuit loop is inevitable in the hybrid SOP during transfer process. Based on the equivalent circuit, the transient current is calculated, according to which two kind of control strategies for converter at outage side to power all the loads are proposed. With the proposed method, the duration time that converter powers full the loads alone decreases and the overcurrent can also be restrained. Two kinds of control strategies are compared from the respects of stability and overcurrent suppression in simulation. The simulation results of the whole transfer process are provided as well.
KW - back-to-back converter
KW - fast interconnection switch
KW - hybrid soft open point
KW - power grid outage
KW - transient short-circuit
UR - https://www.scopus.com/pages/publications/85143746793
U2 - 10.1109/PEAC56338.2022.9959556
DO - 10.1109/PEAC56338.2022.9959556
M3 - 会议稿件
AN - SCOPUS:85143746793
T3 - PEAC 2022 - 2022 IEEE International Power Electronics and Application Conference and Exposition, Proceedings
SP - 355
EP - 360
BT - PEAC 2022 - 2022 IEEE International Power Electronics and Application Conference and Exposition, Proceedings
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 3rd IEEE International Power Electronics and Application Conference and Exposition, PEAC 2022
Y2 - 4 November 2022 through 7 November 2022
ER -