Abstract
Motivated by scheduling practices that require a response to unplanned high-priority jobs as soon as possible without preempting any in-processing jobs, this paper considers a deterministic identical parallel machine scheduling problem to achieve robustness with regard to a worst-case response time. To the best of our knowledge, this paper is the first to study the objective of minimising the maximum inter-completion time, i.e. the maximum time difference between any two consecutive completion times of jobs. For this novel scheduling problem, we first show its NP-hardness, and then propose an integer linear programming formulation and three heuristic approaches. Numerical experiments demonstrate the efficiency of our solution methods.
| Original language | English |
|---|---|
| Pages (from-to) | 182-199 |
| Number of pages | 18 |
| Journal | International Journal of Production Research |
| Volume | 57 |
| Issue number | 1 |
| DOIs | |
| State | Published - 2 Jan 2019 |
| Externally published | Yes |
Keywords
- inter-completion time
- production planning
- robustness
- scheduling